← All projects

HEALTHCARE

Southend Community
Diagnostic Centre.

Temporary services and permanent mechanical installations across a phased healthcare development.

Explore our scope
Reception area at Southend Community Diagnostic Centre
Phase 1 Complete & Operational Phase 1 maintained while the wider works progress
LOCATION Southend-on-Sea
SECTOR Healthcare
OUR PACKAGE Public Health & Mechanical
DELIVERY BASIS Supply & Install

01 / THE PROJECT

An Operational First Phase.
A Wider Installation.

Pintec installed temporary water services for the first operational phase of Southend Community Diagnostic Centre while progressing the permanent mechanical and public health installation across the wider development.

Appointed by the M&E contractor on a supply and install basis, our package covers incoming water infrastructure, clinical plumbing, drainage, heating and chilled water distribution. The centre includes NHS diagnostic services, consulting rooms, theatres and staff facilities.

02 / OUR SCOPE

Water, Heating
& Cooling Systems.

From incoming water and plant connections to distribution pipework and clinical outlets.

Our capabilities

Water Services & Clinical Plumbing

Incoming mains, storage tank and booster connections, with distribution to clinical outlets. Installations include wash hand basins, theatre scrub up troughs, accessible WCs and dirty utility slop hoppers.

Heating & Chilled Water

Low temperature hot water (LTHW) and chilled water distribution serving fan coil units, heater batteries and MRI equipment, with threaded mild steel pipework and flanged prefabricated sections.

Drainage & Alterations

Fusion welded HDPE and solvent weld drainage installations, with cast iron used for modifications to drainage services.

Plant Connections & Testing

Plant room pipework, valve sets and equipment connections. The agreed testing scope includes pressure testing services and air and pour testing drainage.

03 / PHASED DELIVERY

Keeping Phase 1 Operational.

PHASE 1 / OPERATIONAL

Temporary Water Services

Pintec installed a temporary water heater and isolated part of the water distribution to supply the first phase’s sanitaryware.

The first phase services have been maintained while the permanent installation has progressed across the wider footprint.

WIDER WORKS

Permanent Plant & Distribution

The LTHW Plant Room and pipework connections to four air handling units are installed. The wider package includes chilled water distribution from four rooftop chillers.

04 / PLANT & SYSTEMS

Heating, Cooling & Air Handling.

HEATING

LTHW Plant Room

Full pipework installation, including the flow and return headers serving the heating distribution.

Installation Complete
AIR HANDLING

Four AHUs

Pipework, valve sets and final connections to the four air handling units serving the project.

Connections Installed
COOLING

Four Rooftop Chillers

Chilled water pipework from the roof serving the MRI installation and air handling units.

Pipework in Progress

PIPEWORK & JOINTING

The Installation Systems.

Copper
Press fit copper pipework.
Mild Steel
Threaded mild steel pipework with black malleable screwed fittings, alongside flanged prefabricated pipework.
Drainage
Fusion welded HDPE and solvent weld systems, with cast iron used for modifications.

LTHW PRIMARY PIPEWORK

From Drawing to Installation.

Pintec developed the boiler and pipework arrangement, with measured layouts and spool drawings used for coordination, fabrication and installation.

WORK WITH PINTEC

Discuss Your Next Project.

Tendering a project or planning upcoming works? Get in touch to discuss your plumbing, heating and mechanical installation requirements.

Get in touch
PINTEC GROUP SOUTHEND CDC
Plant room pipework and equipment during installation
LTHW Plant Room Work in progress
01 / 04
PINTEC GROUP PROJECT DRAWINGS
Project drawing Southend CDC · Project drawing
View full-size sheet01 / 04